PERFORMANCE CASES

Engineering Cases

Southwest Regional Series Water Conveyor and Diversion Project



Central Yunnan Water Diversion Project


The second phase of the comprehensive utilization of water resources of Ludila Hydropower Station in Dali Prefecture is to meet the water demand of urban life, industry and efficient agricultural development in Binchuan County before the completion of the water diversion project. After the completion of the water diversion project in central Yunnan, the water demand of urban life and industry in Dali Prefecture will be further guaranteed. The water supply can be 12.15 million m and the industrial water supply 5.67 million m to Binchuan County, 68.33 million m³ of water supply to 460000 mu of arable land in the irrigation area; It can provide 118.61 million m³ of urban and industrial water supply to the 1 million population of Xiangyun County, including 64.56 million m³ of urban water supply and 54.05 million m³ of industrial water supply. At the same time, it creates conditions for the central Yunnan water diversion project to supply water to the central Yunnan urban agglomeration with Kunming as the core.

Longtang Reservoir and Irrigation Area Project


The Longtang Reservoir and Irrigation District Project is one of the 172 major water conservancy projects for water saving and water supply determined by the State Council. The project is located in Yanyuan County, Liangshan Prefecture, and the dam site of Longtang Reservoir is about 16 kilometers away from the highway in Yanyuan County. The project development tasks are comprehensive utilization of irrigation, urban and rural domestic water supply and power generation. The total storage capacity of the reservoir is 0.146 billion cubic meters, the total installed capacity of the power station is 7600 kW, and the irrigation area is 362000 mu. The construction of the project plays an important role in promoting the sustainable development of local economy and society and speeding up the income generation of ethnic minority areas. The project is constructed by a consortium composed of China Power Construction East China Institute, Sichuan Water Conservancy Planning and Research Institute, China Power Construction and Hydropower First Bureau, and Sichuan Water Conservancy and Electric Power Engineering Bureau Co., Ltd. The PCCP pipeline used in the project is 63km, with a diameter covering DN600-DN2000 km.
< 1 > proceed page